To reach a local general contractor in Wilmington, NC, call the number on this page. Wilmington General Contractor Pros passes your request to one independent local contractor, who gives you the quote and does the work.
Call to reach a general contractor through Wilmington General Contractor Pros
Say your town and what you want built or changed. A short description of the job is enough to start.
Leave a message with your name, your number and the project. We call you back within one business day and connect you with a local general contractor.
What happens after you call
- You call and describe the job. Give your name, number, town and the project, such as "new vanity and walk-in shower in a hall bath in Wilmington."
- Wilmington General Contractor Pros passes the request to one independent local contractor. Wilmington General Contractor Pros is a referral service and does not do the work.
- You are connected with one local company that you can talk to about your job, and it quotes the project. Ask for the quote in writing. Your agreement is with the contractor, not with Wilmington General Contractor Pros.
Service area: Wilmington and nearby towns
Call about a home in Wilmington or in one of these towns: Leland, Belville, Wrightsville Beach, Carolina Beach, Kure Beach, Boiling Spring Lakes, St. James and Oak Island. If your house is somewhere else, say so on the call.
The town matters because it decides who applies the flood rules. Wilmington, Wrightsville Beach, Carolina Beach and Kure Beach each run their own floodplain ordinance rather than the county's (New Hanover County floodplain page, 2026). For permits outside Wilmington, ask the contractor which office covers your address.
What to have ready when you call
These details help the contractor understand the job before anyone visits. You do not need all of them to make the call.
For a general contractor job
Tell the contractor whether you want one trade done or a project run from start to finish. If you hope to spend $40,000 or more, say so. New Hanover County's permit FAQ says projects valued at $40,000 or more generally require a licensed general contractor, and labor and materials both count toward that value (New Hanover County, 2026). The page on hiring a general contractor shows how to compare bids.
For a kitchen remodel
Say whether you plan to keep the layout or move walls, plumbing or gas lines. Mention new cabinets, counters and flooring as well. The county's list of cosmetic work names paint, flooring, interior trim and cabinets as jobs that need no permit, while structural work needs one (New Hanover County permit FAQ, 2026). That split is why the layout question comes first on a kitchen remodel.
For a bathroom remodel
Say whether you want to keep the tub or switch to a shower, and whether the vanity or toilet will move. A like-for-like swap and a moved drain are different jobs. If the bath is in an older home, mention the year it was built. About 38.8 percent of Wilmington's 67,186 homes were built before 1980 (U.S. Census Bureau, American Community Survey 2024), so many bathrooms here sit in older homes. Start the conversation for a bathroom remodel with what you know about the pipes.
For an addition
If you want more floor area, such as a bedroom, a suite or a sunroom, say so, and say whether it sits on a new foundation. Mention any lot limits you know about. The proposed structure has to meet the city's Land Development Code before a permit is issued (City of Wilmington, 2026). If the lot is near water, say that too. New construction and substantial improvements in the mapped 100-year floodplain must meet standards, mainly by raising the lowest floor (New Hanover County, 2026). Ask the contractor how that affects home additions on your lot.
If your home is in a historic district
Alterations in Wilmington's local historic or overlay districts can need a Certificate of Appropriateness from the city, separate from the county building permit (City of Wilmington, 2026). The city's list names Carolina Heights, downtown and other districts. If your address may be in one, say so.
Timing and storm damage
Give the month you hope to start and any hard date. If the project follows storm damage, say that and mention an open insurance claim. Hurricane Florence made landfall near Wrightsville Beach on September 14, 2018, with a 105 mph gust recorded at Wilmington International Airport (National Weather Service Wilmington).
Your budget and other quotes
A budget range helps the contractor suggest the right scope. Mention other bids you hold so the contractor can explain how its scope differs.
Permits in Wilmington: city and county split the work
Wilmington's permit work is shared. The county's Department of Permits & Inspections issues building permits for work inside city limits, and applicants use the county's COAST online portal or visit in person. The city handles zoning and historic preservation review (City of Wilmington, 2026).
Fees come from the county and depend on the type and size of the job; starting work without a permit carries a $100 penalty at the least (New Hanover County fee schedule, 2026). Ask the contractor which fee applies to your job and who pulls the permit.
North Carolina delayed its 2024 State Building Code, so the 2018 North Carolina State Building Code remains in effect until the new one takes effect (NC Office of State Fire Marshal, April 7, 2025).
Questions about getting a quote
How do I reach a local company?
Call the number on this page and describe the job. Wilmington General Contractor Pros passes your request to one independent local contractor, which prices the project itself.
Who agrees the price for my Wilmington project?
The contractor you are connected with. Ask for the quote in writing, with the work it covers listed line by line.
What should I have ready before I call?
The rooms involved, whether the project adds space, your hoped-for start month, a budget range if you have one, and whether the house is in a historic district or near water.
Does Wilmington General Contractor Pros do the work?
No. Your Wilmington remodel or addition is built by a separate local contractor, and that contractor, not Wilmington General Contractor Pros, signs the agreement with you. Wilmington General Contractor Pros only connects the two of you.
When do I need a licensed general contractor?
New Hanover County's permit FAQ says projects valued at $40,000 or more generally require a licensed General Contractor, counting labor and materials, and splitting purchases does not avoid the rule. Ask the contractor to show its license. Ask the county to confirm how the rule applies to your job.
Can I act as my own contractor?
The county's owner-builder exemption is generally meant for owners who will live in the home as their primary residence for at least 12 consecutive months. It may not apply to LLC-owned, investment, rental or resale properties. Ask the county before you rely on it.
Does the city or the county issue my permit?
For work inside Wilmington city limits, the county issues the building permit and the city reviews zoning and historic districts. Outside the city, ask the contractor which office applies at your address, and ask that office to confirm.
Does a permit change how long my project takes?
It adds inspection steps. County inspections run on business days, and a request entered in the COAST portal before 3:30 pm is scheduled for the next business day. Each inspection takes 5 minutes to 2 hours, and the county does not promise an arrival time (New Hanover County, 2026). Ask the contractor how it schedules them.
Do the beach towns follow the county's flood rules?
Wilmington, Carolina Beach, Kure Beach and Wrightsville Beach each run their own floodplain ordinance. The county administers building-related floodplain rules only in unincorporated areas. Ask the contractor which ordinance covers your address.
Who does the work
Wilmington General Contractor Pros is a referral service operated by wilmingtongeneralcontractorpros.com ("R&S"). We pass your request to an independent local company, which does the work.